Artarmon Railway Station

Client

Transport for NSW

Builder

Gartner Rose

Description of Work

Design and Construction Contract 

CCG were engaged by Gartner Rose to document a reference design (prepared by others), as the lead consultant in the D&C Artarmon Station Accessibility Upgrade for TfNSW. The project consisted of two (2) new lift shafts, a connecting footbridge and emergency egress stair.

The project has provided the community with a long-awaited accessible entry to the island platform station from Hampden Road (previously the only commuter access to the station was via a non-compliant stair).

This project was one of the first undertaken by CCG as an "AEO".

Artarmon Station